CNT-West Garden…. ready for plants

Getting Ready for Water…….

The Raingarden Conveyance Channel  is being lined with river rocks.  The water from the roof will be piped to this lined channel, then will travel to the raingarden basin.  The conveyance channel is steeply pitched away from the building  to encourage the water to travel away from the building. The Channel is also lined with a geotextile fabric to reduce the ability of water to percolate into the soil and gravel along the building foundation.  The river rock lining holds the fabric and looks nice.

Getting Ready for Plants…….

Final grading was performed by raking the planting soil and sculpting it to the final grades. The planting areas were marked with inverted spray paint.  Native plant plugs will be installed by volunteers.  Pictures of the site planted are coming soon….

This slideshow requires JavaScript.

Published by Alexia Landscape Architect; Re-Ecology Land Design

Designing with systems, both natural and man-made, with careful consideration of stewardship and maintenance, will go far in sustainable landscape and sites design.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: